Wigmore Street London

INSTALLATION OF STEEL WINDOWS TO 5th FLOOR.

The client required steel windows to match the rest of the building. The existing windows were obsolete and could not be replaced like for like.

STEEL WINDOW REFURB & REBUILD

CWD retained the existing steel frames and replaced everything else to provide brand new steel windows for installation.

  • Removed existing steel frames back to CWD warehouse

  • All windows fully stripped of leaded glass units, butyl glazing gaskets, and all frames sand blasted before being coating PPC RAL 9005 Jet Black.

  • All 12 windows were rebuilt using brand new leaded pattern glass units, new glazing gaskets, new weathering seals and new perimeter sealants on completion of installation.

STEEL WINDOW INSTALLATION